Sebuah kpl = 150 m, tiba dimuara sungai
dgn sarat depan = 5.5 m & sarat belakang 6.3. MTC = 200 ton/m TPC=15, COF
berada 1,5m dibelakang center line. Kpl baru boleh masuk sungai jika Draft
belakang=6.2 m shg perlu mengisi Ballast pd Fore peak Tank (FPT)
Hitunglah : drink water yg hrs diisi & Final draft
Draft Lama = 6.3 m
Draft yg
diinginkan = 6.2 m
Penguranan Draft = 0.1 m
Boclily
Sinkage = w/TPC= W/15
COD yg
diinginkan = 10 + W/15
COD Aft = l/L x COT
= 73.5 x w x 61.5
150
200
= 0.49 x 0.3075 w
= 0.1507 w
Draft
belakang yg diinginkan = 10 + w/15
0.1507 w = 10 + w/15
2.2605 w = 150 + w
1.2605 w = 150
w = 119.0 Ton
Bodily
Sinkage = W/TPC = 119/15 = 7.93 cm
COT = Wx d = 119 x 61,5 = 36.59 cm
MCTC 200
COD
Aft = l/L x COT = 73.5 /150 x 36,59 cm
=
17.93 cm
COD
fwd = COT – COD
Aft
= 36.59 – 17.93 = 18.66 cm
Fwt Aft
Initial
Draft = 5.5000 m 6.3000
m
Bodily
Sinkage = 0.0793 m + 0.0793
m +
Present
Draft = 5.5793 m 6.3793
m
COD =
0.1866 m + 0.1793 m -
Final Draft = 5.7659 m 6.2000
m